How long does it take to complete the non-standard custom high platform ball valve

Date: 2022.09.23   Views: 720

Share:
The high platform ball valve can be customized according to different pipeline engineering requirements of customers. For special processing and production, it is necessary to provide reference drawings, structural drawings, external dimensions, material technology, connection method, drive method and other related product information, the more detailed the better. The non-standard customized high platform ball valve takes about 20 days to complete according to the process, but the high platform ball valve adopts a new casting process, which is more complicated than the ordinary ball valve process, the manufacturing cost is higher, and the construction period is longer. The actual processing time is still related to the production strength of the valve manufacturer. There is only one purpose, that is to provide customers with the most beautiful and good products.

The high platform ball valve produced by Jingjun Valve is widely used in petroleum, chemical, natural gas, power plant, metallurgy, water treatment and other fields; Applicable medium: water, gas, oil, natural gas and acid-base corrosive medium; Drive mode: manual, Worm gear drive, pneumatic, electric, hydraulic, etc.

Sign up for the newsletters